Sentence 9.30.6.1.(2)

  1. OH1
  2. OS3
  3. OS2

Objective

OS2 Structural Safety

Attribution

[F81-OS2.3]Applies where finished flooring is required to provide water resistance.

Intent

Intent 1:

To limit the probability of differential movement between adjoining panels, which could lead to the cracking of ceramic tile.

Where finished flooring is required to provide water resistance, this is to limit the probability of the ingress of water into the subfloor, which could lead to compromised structural integrity of the supporting structure, which could lead to an inability to resist expected gravity loads, which could lead to structural collapse, which could lead to harm to persons.

Top of Page