Sentence 9.33.6.7.(7)

  1. OH1
  2. OS2
  3. OS3

Objective

OS2 Structural Safety

Attribution

(a),(b)[F40,F62-OS2.3]

Intent

Intent 1:

To limit the probability of inadequate drainage, which could lead to the accumulation of water in ducts, which could lead to:

  • excessive relative humidity, or
  • the accelerated deterioration of ducts.

This is to limit the probability of deterioration, which could lead to compromised structural integrity, which could lead to harm to persons.

Top of Page