Sentence 9.35.3.4.(1)

  1. OS2
  2. OP2

Objective

OS2 Structural Safety

Attribution

Intent

Intent 1:

To limit the probability of an inadequate clearance above ground level of moisture-vulnerable columns, which could lead to repeated exposure to water from rain runoff or melting snow, which could lead to the deterioration of columns, which could lead to structural failure, which could lead to harm to persons.

Top of Page