Sentence 4.2.7.5.(1)

  1. OS2
  2. OP4
  3. OP2

Objective

OS2 Structural Safety

Attribution

Intent

Intent 1:

To limit the probability that the method of installation of deep foundation units will impair:

  • the properties of soil or rock,
  • the strength and integrity of previously installed units, and
  • the integrity of neighbouring buildings.

This is to limit the probability of installing a foundation with a reduced capacity, which could lead to structural failure, which could lead to harm to persons.

Top of Page