To limit the probability that inappropriate design, construction or installation will lead to performance that is significantly below expectations, which could lead to the creation of ignition sources as a result of the use or operation of heating, ventilating or air-conditioning equipment, which could lead to the ignition of gases, dusts, vapours or residues, which could lead to fire or explosion, which could lead to damage to the building.