Sentence 8.2.2.1.(1)

  1. OS5
  2. OS5

Objective

OS5 Safety at Construction and Demolition Sites

Attribution

Intent

Intent 1:

To limit the probability that water will cause the failure of the sides of the excavation, which could lead to the ground surrounding the excavation collapsing into the excavation, which could lead to harm to persons.

Top of Page