Sentence 9.15.3.6.(2)

  1. OS2
  2. OP2

Objective

OP2 Structural Sufficiency of the Building

Attribution

Intent

Intent 1:

To limit the probability of insufficiently wide strip footings, which could lead to compressive failure and excessive settlement of underlying soil, which could lead to the collapse of interior non-loadbearing masonry walls, which could lead to damage to the building.

Top of Page