Sentence 9.15.4.2.(5)

  1. OS2
  2. OP2
  3. OH1
  4. OH4
  5. OS3

Objective

OP2 Structural Sufficiency of the Building

Attribution

Intent

Intent 1:

To limit the probability that the vertical reinforcement will be interrupted at critical transition points or that it will be insufficiently embedded to develop a bond with the concrete, which could lead to an inability to support transverse or vertical loads, which could lead to the cracking or displacement of foundation walls.

This is to limit the probability of compromised structural integrity, which could lead to:

  • structural failure,
  • where elements support or are part of an environmental separator, the displacement or failure of required environmental separation elements, which could lead to the deterioration of building elements, or
  • an inability to resist expected loads, which could lead to
    • the excessive deformation or deflection of walls, or
    • the excessive deflection or vibration of floors.

This is to limit the probability of:

  • the space being unsuitable for its intended use, or
  • damage to the building.