Sentence 4.1.6.8.(2)

  1. OS2
  2. OP2

Objective

OS2 Structural Safety

Attribution

Intent

Intent 1:

To limit the probability that the snow accumulation around an inside corner will be incorrectly calculated, which could lead to the roof being designed for less than the maximum expected accumulation of snow, which could lead to structural failure, which could lead to harm to persons.

Top of Page