Intent 1:
To limit the probability that the number and distribution
of higher strength braced wall panels will not be sufficient, which
could lead to an inability to resist expected lateral loads, which
could lead to excessive racking.
This is to limit
the probability of compromised structural integrity, which could lead
to:
- the structural collapse of wood-frame construction,
or
- the excessive deformation, displacement or failure of
required environmental separation elements, which could lead to deterioration,
which could lead to further compromised structural integrity.
This is to limit the probability of:
- the space being unsuitable for its intended use,
- compromised operation of doors or windows, or
- damage to the building.