Sentence 9.36.2.5.(2)

  1. OE1

Objective

OE1 Resources

Attribution

Intent

Intent 1:

To limit the probability that the continuity of the insulation at the point of penetration of an exterior wall or insulated roof or ceiling by an interior wall, foundation wall, firewall, party wall or structural element will be broken, which could lead to excessive thermal transfer through the building envelope, which could lead to excessive use of energy for heating and cooling, which could lead to an unacceptable effect on the environment.

Top of Page