Sentence 9.36.5.4.(3)

  1. OE1

Objective

OE1 Resources

Attribution

Intent

Intent 1:

To limit the probability that schedules with large intervals will be used in the energy model calculation method, which could lead to inaccurate results, which could lead to overestimation of the energy used by the reference building or underestimation of the energy used by the proposed building, which could lead to excessive use of energy, which could lead to an unacceptable effect on the environment.

Top of Page