Sentence 9.26.4.4.(2)

  1. OH1
  2. OS2
  3. OS1
  4. OP1
  5. OS3

Objective

OP1 Fire Protection of the Building

Attribution

[F61-OP1.1]Applies where counter flashing is installed between a shingle roof and a masonry chimney.

Intent

Intent 1:

Where counter flashing is installed between a shingle roof and a chimney, to limit the probability of:

  • water running down the face of masonry and entering behind primary flashing, or
  • the intersection being unable to accommodate differential vertical movement of chimneys and roof surfaces, which could lead to the displacement of or damage to flashing.

This is to limit the probability of precipitation or meltwater ingress into chimneys, which could lead to damage to chimney liners from freeze-thaw stresses, which could lead to the escape of heat or flames, which could lead to the ignition of combustible building components, which could lead to damage to the building [see analysis for Sentence 9.21.4.6.(1)].