Sentence 4.1.8.16.(6)

  1. OS2
  2. OP2
  3. OS2
  4. OP2
  5. OS2
  6. OP2

Objective

OS2 Structural Safety

Attribution

(a)[F22-OS2.4]

Intent

Intent 1:

To limit the probability that pile footings, drilled piers and caissons will spread apart due to the maximum expected seismic forces, which could lead to structural failure, which could lead to harm to persons.

Top of Page