Sentence 4.1.8.16.(6)

  1. OS2
  2. OP2
  3. OS2
  4. OP2
  5. OS2
  6. OP2

Objective

OP2 Structural Sufficiency of the Building

Attribution

(b)[F22-OP2.4]

Intent

Intent 1:

To limit the probability that the piles, drilled piers and caissons will slide relative to the pile cap or structure, which could lead to:

  • damage to the building, or
  • damage to the building, which could impede the intended use and occupancy of the building.
Top of Page