Sentence 2.6.1.3.(2)

  1. OP5

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that a lack of shut-off valves or inappropriately located shut-off valves will lead to an inability to quickly shut off the water supply in the event of leakage, which could lead to damage to the building or facility.

Top of Page