Sentence 2.6.1.7.(9)

  1. OP5

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that water will leak from the tank onto elements below, which could lead to damage to the building or facility.

Top of Page