Sentence 2.6.1.3.(3)

  1. OP5

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that a lack of shut-off valves or inappropriately located shut-off valves will lead to an inability to quickly shut off the water supply if leaks occur, which could lead to damage to the building or facility.

Top of Page