Sentence 2.2.5.7.(1)

  1. OH2
  2. OP5

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that CPVC hot and cold water pipe, fittings and solvent cements will not meet proper standards, which could lead to such pipe, fittings and solvent cements not performing in the way intended, which could lead to the failure of the pipe, fittings or solvent cement, which could lead to leakage or flooding, which could lead to damage to the building or facility.

Top of Page