Sentence 2.2.10.13.(1)

  1. OS3
  2. OH2
  3. OP5

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that performance of equipment for solar heating of potable water will fall significantly below expectations, which could lead to an inability to limit or accommodate water pressure, which could lead to failure or the inadequate operation of equipment, which could lead to leakage, which could lead to damage to the building or facility.

Top of Page