Sentence 2.6.1.2.(1)

  1. OP5

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that an inability to drain or blow out systems will lead to freezing as a result of heating system failure or seasonal shutdown, which could lead to failure and leakage of water, which could lead to damage to the building or facility.

Top of Page